Project Details

  • Construction Date

    July 2009

  • Location

    Menlo Park, CA

  • Surface Area

    40,000 sqft

Project Description

Challenge: Failing Capsheet with Granule Loss

  • Constant leaks
  • High interior temperatures
  • Granule loss and premature membrane degradation

Solution: Evercoat EC

  • Make seams, perimeter, and penetrations watertight
  • Prevent further membrane degradation and granule loss
  • No costly and risky tear-off and business disruptions
  • Reduced interior temperatures significantly by cutting surface temperatures by 70 degrees F
  • Watertight sustainable roofing system.