Project Details

  • Construction Date

    May 2008

  • Location

    Sacramento, CA

  • Surface Area

    55,000 sqft

Project Description

Challenge: Failing capsheet with granule loss

  • Constant leaks
  • High energy costs
  • Granule loss and premature membrane degradation

Solution: Evercoat EC with Evercoast AC Base

  • Prevent further membrane degradation and granule loss.

  • No costly and risky tear-off and business disruptions.

  • Reduced conditioning costs significantly by cutting surface temperatures by 70 degrees F.

  • Exceptional Durability (photo below after 8 years)

  • Watertight sustainable roofing system.