Contractor:
Draper Construction & Commercial Roofing of Oklahoma City, OK
Project Location:
Enid, OK
Construction Date:
May 2025
Products Used:
- Everest EC Grey
- Everest HT White
- Eco Level
- Everseal
- Everknit Fabric
Project Description:
The storage units had an aged TPO roofing system and had multiple areas with repairs that were failing. After an inspection, it was determined that a coating would be best for this restoration.
Project Steps:
- Pre-construction meeting with Spare Box Storage representation.
- Power wash and blow roof to remove all dirt and debris.
- Seal drip edge, seams, and edges.
- Apply Evercoat EC base gray, at approx. rate of 2.5 gal./sq. (20 year), back-rolling to fill any pin holes.
- Apply Evercoat HT white top coat, at approx. rate of 2.5 gal./sq. (20 year).
- Clean up and haul away all roofing debris.